IV
All Movements (Oct-2026)
8 Movements
AED 1,625,400.00 Transacted
Issues to Contractor
5 Outward Issues
Debited to Project CWIP
Inter-Site Yard Transfers
2 Transfers
Palm Crest ↔ Marina Heights
Site Unused Material Returns
1 Inward Return
Restocked to Central Stores
Showing 8 Stock Movements
Movement No. Type Date From Location / Store To Destination / Project Contractor / Sub-Contractor Lines Total Value (AED) Finance Posting Status Action
ST-2026-00101 Project Issue 10-Oct-2026 Palm Crest · Material Yard B Palm Crest · Tower 1 Podium Core Arabtec Construction LLC 2 Items 187,200.00 JV-2026-00865 Posted
ST-2026-00102 Site Transfer 09-Oct-2026 Marina Heights · Central Yard Palm Crest · Material Yard B Internal Logistics (Fleet 04) 1 Item 93,600.00 JV-2026-00866 Posted
ST-2026-00103 Project Issue 08-Oct-2026 Marina Heights · Basement Depot Marina Heights · Level 22 MEP Plant BK Gulf MEP Contractors 4 Items 342,000.00 JV-2026-00867 Posted
ST-2026-00104 Project Issue 07-Oct-2026 Central Dubai Logistics Depot Marina Heights · Façade Elevation Al Abbar Façade Systems 1 Item 441,750.00 JV-2026-00868 Posted
ST-2026-00105 Site Return 05-Oct-2026 Palm Crest · Podiums (Surplus) Palm Crest · Material Yard B Arabtec Construction LLC 1 Item -28,080.00 JV-2026-00869 Restocked
ST-2026-00106 Project Issue 04-Oct-2026 Business Bay · Electrical Store Business Bay · Substation 1 Al Shirawi Electrical Contracting 2 Items 385,000.00 JV-2026-00870 Posted
ST-2026-00107 Site Transfer 03-Oct-2026 Central Depot (JAFZA) Business Bay Offices · Store Internal Logistics (Fleet 02) 3 Items 129,500.00 GP-EXIT-9104 In Transit
ST-2026-00108 Project Issue 01-Oct-2026 Palm Crest · Material Yard B Palm Crest · Raft Foundation Zone 3 Arabtec Construction LLC 1 Item 74,430.00 JV-2026-00871 Posted